On a Charlotte wood-frame or podium project the underwriter’s first questions are about fire during construction: who manages it, where combustibles and generators sit, when sprinklers go live. Then come the code edition, the site and stormwater work in the contract value, and the wind and hail deductible. Flood and earth movement are usually excluded or sublimited and need their own answer.
What the SouthPark fire showed underwriters
WFAE reported that the building was a 239-unit apartment project, that a generator’s diesel motor in the trailer caught fire and the spray foam in the same trailer ignited, and that the two workers who died were on the sixth floor, about 460 feet from the building’s only exit. The North Carolina Department of Labor found eight violations, including exits that were not arranged to give workers an easy way out.
The worker safety findings belong to the contractors’ liability and workers’ comp programs. For the property policy, the lesson is about how a wood frame burns before it is closed in. On a Charlotte submission I describe:
- Who runs fire prevention on site, how often the site is walked and what is written down.
- Where generators, fuel, foam and other combustibles are kept, and how far they are from the structure.
- Standpipes and water supply for the fire department as the building rises.
- When sprinklers and alarms are expected to be in service, floor by floor.
- Hot work rules and after-hours checks.
North Carolina’s 2024 code is still waiting
The North Carolina Building Code Council approved the 2024 State Building Code, including a chapter on construction sites with large wood-frame buildings. WFAE reported that it calls for an independent fire safety manager on site who inspects daily and a fire prevention program submitted to the fire department. The General Assembly has delayed the code’s effective date more than once. Under Session Law 2025-2, it takes effect twelve months after the State Fire Marshal certifies that set conditions have been met, and the State Fire Marshal’s office wrote in March 2026 that construction and code enforcement were continuing under the 2018 code. An owner can ask to use the 2024 code as an alternative, and then it applies to the whole project.
For builder’s risk this matters in two ways. Underwriters give credit for the kind of fire prevention program the new chapter describes, whether or not the code requires it yet, so it is worth putting in writing. And if a covered loss destroys part of the work, the rebuilt portion may have to meet a newer code than the original permit. Ask whether the form pays the extra cost of meeting code on damaged work.
Completed value, soft costs and testing
- Completed value. The limit is usually the full value of the finished work, including site work, owner-furnished materials and change orders. A builder with several jobs may use a reporting form and declare values monthly.
- Soft costs and delay. When a fire or storm pushes back completion, interest on the construction loan, extended fees and lost rents keep running. That coverage is added separately, with its own limit and a waiting period before it starts paying.
- Testing and commissioning. Start-up of building systems is often covered only by endorsement. Confirm it before the mechanical contractor starts testing.
- Water damage. Rain through an open roof, a broken temporary line or a sprinkler test gone wrong is one of the most common builder’s risk claims. Read the water deductible and any conditions about weather protection.
Creek buffers and site work
Charlotte’s Post-Construction Stormwater Ordinance requires new development to install stormwater control measures, keep stream and lake buffers ranging from 30 to 200 feet wide, and set aside open space of 10 to 25 percent of the developed area depending on how much is built upon. The city applies it to redevelopment as well as new development.
Those buffers usually mean the site sits close to a creek. A detention pond, a storm line or newly graded slopes damaged in heavy rain before the site is stabilized is a builder’s risk question. I check whether site work is in the insured value, whether flood is excluded or sublimited, and how the policy treats earth movement and washout. Commercial flood insurance.
Inland wind, hail and the deductible
Charlotte is far from the coast, but hurricane remnants, tornadoes and thunderstorm hail all reach it. A structure that is framed but not sheathed, or a roof that is half on, is most exposed in those weeks.
- Read the wind and hail deductible. It may be a percentage of the project value at the time of loss, not a flat amount.
- Ask how a named storm is defined. Some forms start a named-storm deductible when a watch or warning is issued for any part of the state.
- Show the bracing plan for tall walls and the plan for securing materials when a storm is forecast.
How wind and hail deductibles work.
Renovations, wraps and equipment
Existing buildings. On a major renovation of an older mill or office building, the builder’s risk form covers the new work. The existing structure has to be insured too, either on the owner’s property policy or added by endorsement. Commercial property insurance in Charlotte.
Wrap-ups. Large projects may use an owner- or contractor-controlled insurance program for liability and workers’ comp. Builder’s risk is usually bought next to it.
Equipment. Cranes, lifts and tools need the contractor’s own equipment coverage. Charlotte contractor insurance.
What to send me
- The address, the project type and whether it is ground-up or renovation.
- Completed value, with site work and owner-furnished items shown.
- Soft costs: loan interest, rents and fees, and the lender’s insurance requirements.
- Construction type, stories, units and the date sprinklers are expected in service.
- The site fire prevention plan and where generators, fuel and materials will be kept.
- Schedule: start, dry-in and completion.
- The contract clause that says who buys the policy.
Call or text (877) 711-4545.
Common questions
Do you have an office in Charlotte?
No. Alishahi Insurance has one office, in Beverly Hills, California. I am licensed in North Carolina and place builder’s risk for Charlotte projects by phone, text and email.
Which North Carolina building code applies to my project?
The 2024 State Building Code’s effective date has been delayed by law, and the State Fire Marshal’s office said in March 2026 that work continued under the 2018 code. Confirm with Mecklenburg County which edition your permit was reviewed under.
Does builder’s risk cover a fire on a wood-frame project?
Yes, fire is a core covered cause of loss. The underwriter will ask about site fire prevention, combustible storage and when sprinklers go into service before quoting.
Does builder’s risk cover lost rent if a fire delays completion?
Only if delay-in-completion or soft-cost coverage is added. It has its own limit and a waiting period.
Is flood covered on a Charlotte job site?
Most builder’s risk forms exclude flood or give it a small sublimit. A site near a creek or the Catawba needs flood addressed separately.
Who should buy the policy, the owner or the general contractor?
Either can. The construction contract should say which, and the other party should be named on the policy.
General information about builder’s risk insurance for Charlotte construction as of November 2026, not legal advice. North Carolina’s code effective dates, Mecklenburg County permit rules and Charlotte’s stormwater ordinance change; confirm your project’s requirements with Mecklenburg County Code Enforcement and Charlotte Storm Water Services, and read your own policy wording. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.