On a Denver project an underwriter asks first about fire before the building is protected, then about the code edition the permit was reviewed under, the hail and wind deductible, and how the building is heated and monitored through a cold snap. Flood and earth movement are usually excluded or sublimited. Send the value, construction type and schedule and I can take the project to market.
Two fires, one lesson
Emerson Place, March 7, 2018. More than 50 workers were inside the five-story apartment building at 1833 Emerson Street when the fire started on the third floor; most escaped by jumping from the second and third stories, and two workers died. The Fire Department later said the cause remained undetermined and that it had ruled out framers, welders, plumbers, drywall and insulation workers, electricians and the site’s temporary power.
Leetsdale Drive, January 2, 2026. The ATF sent its national response team to help Denver investigators. Division Chief Robert Murphy said the building’s unfinished state may have helped the fire spread so quickly, and that investigators were checking whether the construction fire prevention measures required on site were being met.
Neither case needed a dramatic cause. A wood frame without walls, alarms or sprinklers burns fast. On a Denver submission I describe:
- Who manages fire prevention on site and how often the site is checked, including nights and weekends.
- Standpipes, hydrants and fire department access as the building rises.
- When sprinklers and alarms are expected in service.
- Security: fencing, cameras, lighting and guard service. Theft and vandalism of materials are covered on most forms, often with conditions.
The 2025 Denver Building Code and the value you insure
Denver adopted its 2025 building and fire codes on June 13, 2025. They are based on the 2024 International Building, Existing Building, Residential, Mechanical, Plumbing, Fuel Gas and Fire Codes and the 2021 International Energy Conservation Code, with Denver amendments. The city allowed a transition period of about six months when either the 2022 or the 2025 Denver Building Code could be used.
A project permitted near that line could be under either edition. The completed value should match the code the plans were reviewed under. If a covered loss destroys part of the work, the rebuilt portion may need to meet the newer code, so ask whether the form pays the added cost of meeting code on damaged work and what limit applies.
Hail and wind on an open building
Hail is the loss Denver owners think about first, and a building under construction has more to lose than a finished one: roofing membranes before ballast or cover boards, skylights and curtain wall glass waiting to be installed, rooftop equipment set before it is anchored and screened, and windows stacked on a floor.
- Wind and hail deductible. Often a percentage of the project value at the time of loss, not a flat amount.
- Cosmetic damage. Some forms limit coverage for dents to metal panels and equipment that do not affect function. Ask before the roofing contractor orders material.
- Protection of stored materials and how the site is secured when a storm is forecast.
How wind and hail deductibles work.
Cold snaps, temporary heat and water
Arctic fronts can drop Denver temperatures fast, and a project with charged sprinkler lines, new plumbing and wet finishes in floors that are not fully heated is exposed overnight. Water damage, from freeze breaks, rain through an open roof or a failed temporary line, is one of the most frequent builder’s risk claims.
- Temporary heat: what is used, who checks it and how alarms reach someone at night.
- When lines are charged and whether unheated floors are drained.
- The water deductible and any conditions in the form about heat and monitoring.
Completed value, soft costs and testing
- Completed value or reporting form. One large project is usually written at completed value. A builder running several homes or small buildings may report values monthly.
- Soft costs and delay. Loan interest, fees and lost rent after a covered loss delays opening are added by endorsement, with their own limit and waiting period. After a fire like the two above, the rebuild can take many months.
- Testing and start-up. Commissioning of building systems may require an endorsement.
- Existing buildings. On a renovation or adaptive reuse, the existing structure usually stays on the owner’s property policy unless it is added. Commercial property insurance in Denver.
- Wraps and equipment. An owner- or contractor-controlled program covers liability and comp, not the building. Cranes and tools belong on the contractor’s equipment coverage.
How builder’s risk works; Denver contractor insurance.
What to send me
- The address, the project type and whether it is ground-up or renovation.
- Completed value, with site work and owner-supplied items shown.
- Construction type, stories, units and the code edition on the permit.
- Soft costs you want covered and the lender’s requirements.
- The site fire prevention and security plan.
- Schedule: start, roofing, dry-in, sprinklers in service and completion.
- The contract clause that says who buys the policy.
Call or text (877) 711-4545.
Common questions
Do you have an office in Denver?
No. Alishahi Insurance has one office, in Beverly Hills, California. I am licensed in Colorado and place builder’s risk for Denver projects by phone, text and email.
Which building code applies to my Denver project?
Denver adopted its 2025 codes, based on the 2024 International Codes, on June 13, 2025, with a transition of about six months. Confirm with Community Planning and Development which edition your permit was reviewed under.
Does builder’s risk cover a fire before the sprinklers work?
Yes, fire is a core covered cause of loss. Underwriters will ask about site fire prevention, security and when sprinklers go into service before they quote.
Does builder’s risk cover hail damage to materials on site?
Materials meant for the project are usually covered, subject to the wind and hail deductible and any limits on cosmetic damage.
Does builder’s risk pay lost rent if a fire delays completion?
Only if delay-in-completion or soft-cost coverage is added. It has its own limit and waiting period.
Who buys the policy, the owner or the contractor?
Either can. The construction contract should say which, and the other party should be named on the policy.
General information about builder’s risk insurance for Denver construction as of November 2026, not legal advice. Denver’s building and fire codes, permit procedures and fire investigations change or remain open; confirm your project’s requirements with Denver Community Planning and Development and the Denver Fire Department, and read your own policy wording. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.