Contractors installing a metal roof on a beachside structure
Builder’s Risk · Miami, FL

Builder’s risk insurance in Miami

On September 10, 2017, as Hurricane Irma’s winds reached Miami-Dade, two tower cranes collapsed: one in downtown Miami onto a high-rise under construction, close enough to the Metromover that the system was shut for several days, and one on Northeast 30th Terrace, left dangling over an unfinished tower. The county’s own resolution records both. For a Miami high-rise, that is the picture underwriters have in mind when they price the wind on a building that is not finished yet.

By Sam Alishahi · CA Insurance License #4348151 · Reviewed November 2026 · How this page is researched

Miami projects at a glance

Builder’s risk insures the building under construction and the materials for it, and with the right endorsements, the interest and rents you lose when a covered loss delays completion. In Miami the policy turns on the named storm deductible, flood written separately, the hurricane plan for the site and the crane, and the right limit for a building being built to High-Velocity Hurricane Zone standards. I place it from Beverly Hills; there is no office in Miami.

Who sets the rules for cranes in a hurricane

Miami-Dade passed a Crane Safety Ordinance in March 2008 with a hurricane preparedness section and a wind standard of about 140 miles per hour for tower cranes. A federal court blocked parts of it after an industry suit, but the hurricane preparedness section survived. Then in 2012 the Legislature added subsection (11) to section 489.113 of the Florida Statutes, which preempts local regulation of construction cranes and hoists to the state, including worksite rules on hurricane preparedness. In January 2025 the County Commission adopted Resolution R-67-25, again asking the Legislature to repeal that preemption, citing Irma and the crane that fell in St. Petersburg during Milton.

So in Miami the hurricane plan for the crane comes from the manufacturer, federal OSHA rules, your contract and your insurers, not a county ordinance. For the policy:

  • The crane is not the project. It belongs on the crane owner’s or contractor’s equipment policy. Builder’s risk covers the building it damages.
  • Damage to the street, the neighbors or the Metromover is liability, carried by the contractor’s general liability and umbrella. Contractor insurance in Miami.
  • Underwriters ask for the written plan: weathervaning, what comes off the upper floors and the roof, who decides when the site shuts down.

The named storm deductible and wind sublimits

On a Miami builder’s risk, wind is usually covered with its own named storm deductible, written as a percentage of the values at the site, sometimes with a minimum, and sometimes with a sublimit below the full project value on large towers. The trigger matters: some forms apply it only to a storm named by the National Hurricane Center, others to any windstorm during hurricane season. Values grow every month on a tower, so the same percentage costs more near topping out than in month two. I set those terms out side by side when quotes come back.

Miami-Dade is in the Florida Building Code’s High-Velocity Hurricane Zone, which requires the whole envelope to be impact resistant. Approved windows, doors and roof systems cost more and take longer to arrive, which is why the completed value and the soft-cost period both need to be realistic. How the zone affects the finished building.

Flood, surge and site grades

Most builder’s risk forms exclude flood or give it a sublimit, so flood and storm surge are usually a separate placement for a Miami project, especially on the bay or near a canal. Miami-Dade’s County Flood Criteria set the minimum flood protection level for the finished grade of developed sites and for road crowns; the Florida Building Code sets the finished floor. A site being filled and graded to those levels is a site where a heavy rain can still put water into an open foundation or a basement garage before the drainage is finished.

  • Ask about dewatering and below-grade work. Underwriters want to know how deep the excavation goes and how water is pumped out.
  • Ask how flood is defined. Surge, rising water and heavy rain pooling on a site can fall under different clauses. Commercial flood coverage.

The December 31, 2026 code change

Miami-Dade’s Permitting and Inspection Center says the 9th Edition of the Florida Building Code becomes effective on December 31, 2026, that online applications submitted after 4 PM on December 30 must comply with it, and that extensions for expired applications have to be requested in writing within 180 days. A project that slips into the new edition may cost more; tell me and the completed value on the policy can be adjusted before a loss, not after.

Renovating an existing building

Much Miami work is in buildings that already stand: condo repairs, recertification work, conversions. A builder’s risk on that kind of job may cover only the renovation work, leaving the existing building on the association’s or owner’s property policy. Both carriers need to know about the other, and the contract should say which policy answers if a fire in the renovated floor spreads into the rest of the building. Apartment building insurance in Miami.

What to send me

  • Address, flood zone and distance to the bay or a canal.
  • Completed value and the soft costs and rents to protect, with the lender’s requirements.
  • Height, stories, construction type and below-grade levels.
  • Schedule and permit status under the 8th or 9th Edition.
  • Hurricane plan and crane details.
  • For renovations, the value of the existing building and its current policy.
  • The construction contract and any wrap-up (OCIP or CCIP) program.

Common questions

Do you have an office in Miami?

No. Alishahi Insurance has one office, in Beverly Hills, California. I place builder’s risk for Miami projects by phone and email under my Florida nonresident license.

Does Miami-Dade require a hurricane plan for tower cranes?

The county’s 2008 ordinance had one, but section 489.113(11) of the Florida Statutes preempts local crane rules, including hurricane preparedness. Your contract and insurers will still ask for a plan.

Does builder’s risk cover a crane that falls on my building?

Damage to the building under construction can be covered by builder’s risk. The crane itself and damage to neighboring property fall under other policies.

Is flood included in builder’s risk in Miami?

Usually not in full. Most forms exclude flood or give it a sublimit, so it is often written separately.

How does the named storm deductible work on a tower?

It is usually a percentage of the values at the site when the storm hits, so it grows as the building does. Read the trigger and any minimum.

Is a wrap-up the same as builder’s risk?

No. An OCIP or CCIP covers liability and often workers’ comp for everyone on the project. Builder’s risk covers the building itself.

General information about builder’s risk insurance for Miami-Dade projects as of November 2026, not legal advice. Florida statutes, county flood criteria and Florida Building Code editions change; confirm your project’s requirements with Miami-Dade’s Department of Regulatory and Economic Resources or your city’s building department and read your own policy wording. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.

Miami projects

Send the value, the height and the hurricane plan.

With the completed value, the schedule, the flood details and the contract, I can take the project to builder’s risk and flood markets.

Alishahi Insurance · Saman Alishahi, independent insurance broker, California License #4348151, 439 N Canon Dr, Penthouse, Beverly Hills, CA 90210. Serving Miami from the Beverly Hills office; no office in Miami. General information, not a quote or a promise of coverage.

Get a quote

Tell me how to reach you. I’ll take it from there.

Takes about 30 seconds. Your next step comes by email, and you get an update at every step until your quotes are ready.

(877) 711-4545

Answered 24/7 · CA License #4348151

Only your name, phone and email are required; every question here is optional. This is a request for insurance: Alishahi Insurance (Saman Alishahi, licensed insurance agent) will contact you about it by email, and by text if you check the box. Sending this form doesn’t bind coverage; coverage starts only when it’s confirmed in writing.

Not shopping yet?

Get a reminder before your renewal.

Tell me when your policy renews and I’ll email you about six weeks before, when it’s worth comparing. One email, no calls.