The City of Modesto licenses businesses through its Finance Department, and every applicant files a stormwater discharge compliance form before a license is issued or renewed. Road jobs funded by Measure L are public works. Plant jobs put your crew inside someone else’s food or farm operation, which is where most of the larger claims come from.
Who this page is for
Licensed contractors in Modesto, Ceres, Turlock, Riverbank and the rest of Stanislaus County: paving, grading and concrete firms, steel-building and general contractors, electrical, HVAC and sheet metal shops that service processing plants, roofers, painters and remodelers in the older neighborhoods off downtown. Quotes, changes and certificates are handled by phone, text and email. Trade pages: paving, concrete, sheet metal, painting.
City of Modesto paperwork
- Business license through Finance. The Business Licensing Division sits in the Finance Department at 1010 10th Street, and it offers an Outside Business license for firms based elsewhere that work in the city. Stanislaus County licenses only businesses located outside city limits.
- The stormwater form. The City asks every business to submit a Stormwater Discharge Compliance Form before applying for or renewing a license. For a concrete, paving or painting contractor, washout and runoff are the everyday version of that question, and they are also a pollution liability question.
- City contracts. City of Modesto bid documents require the City business license before work starts and for the length of the agreement, and the City’s housing rehabilitation bids call for a Class B general building license and proof of insurance.
Measure L road work
Stanislaus County voters approved Measure L on November 8, 2016: a half-cent transportation sales tax that took effect on April 1, 2017 and runs 25 years, administered by the Stanislaus Council of Governments, with each city and the county choosing its own local road projects. That money reaches paving, striping, concrete, signal and underground contractors through public bids.
- DIR registration and prevailing wage on public works above $25,000 for construction, for you and every sub you list.
- Work zones. Traffic control, a crew in a lane and a driver who hits a cone line are auto and liability exposures; the agency’s insurance exhibit sets the limits and the additional insured wording.
- Bonds. Public road contracts call for bid, performance and payment bonds, placed separately from the CSLB license bond.
Food plants, hullers and dairies
The county agricultural commissioner valued Stanislaus County’s 2024 farm production at about $3.15 billion, with almonds the largest single crop at about $824 million. The buildings that handle that output, hullers, cold storage, dairies, wineries and processing lines, are where Modesto contractors take on exposures a residential policy was never rated for:
- Spoiled product. A power cut, a refrigeration fault or a roof leak over stored product can become a property damage claim much larger than your contract. Size liability and the umbrella to what is inside.
- Hot work and dust. Welding near nut dust, hulls or packaging is a fire exposure underwriters ask about by name; a written hot-work procedure helps.
- Plant contracts. Processors and growers often require additional insured status and a waiver of subrogation, and some require a site safety orientation for every worker.
The rest of the program
- General liability written for the operations you actually perform, with completed operations kept in force.
- Workers’ comp: required today for anyone on payroll and, regardless of employees, for C-8 concrete, C-20 HVAC, C-22 asbestos abatement and C-39 roofing licenses; every license follows on January 1, 2028. What the 2028 rule means.
- LLC licensees meet CSLB’s liability insurance minimum and post a worker bond in addition to the license bond.
- Commercial auto for trucks on 99 and county roads, and equipment coverage that follows the pavers and lifts.
What to send me
- CSLB license and classifications, and DIR registration for public works.
- The mix: road and public, food plant or farm, commercial, residential.
- Payroll by trade with prevailing-wage payroll split out, and subcontractor costs.
- Vehicles and equipment with values.
- Current policies, five years of loss runs, and any plant or agency contract’s insurance section.
Call or text (877) 711-4545. From outside the U.S. or Canada: +1 (424) 552-4545.
Common questions
Do you have an office in Modesto?
No. Alishahi Insurance has one office, in Beverly Hills. Modesto contractors are served by phone, text and online, and certificates go out by email.
Why does Modesto ask for a stormwater form with my business license?
The City asks every business to submit a Stormwater Discharge Compliance Form before it applies for or renews a license. For contractors, runoff and washout are also a pollution exposure most liability policies exclude.
Is a Measure L paving job public works?
Road projects paid for by public agencies are generally public works; above $25,000 for construction, DIR registration and prevailing wage apply. The bid documents say which rules govern the job.
Does my liability cover spoiled product at a processing plant?
It can respond to property damage you cause, but the limits must fit the value stored there. Describe plant work to the underwriter so the policy is rated for it.
Do I need workers’ comp if I work alone?
Concrete, HVAC, asbestos abatement and roofing licenses already do. Every licensed contractor does from January 1, 2028 under SB 1455.
General information about contractor insurance in Modesto as of November 2026, not legal advice. City requirements, Measure L programs, CSLB rules and carrier appetite change; check the current sources for your license and contract. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.
