New York’s rules for office buildings came in layers after big fires and after September 11: Local Law 5 of 1973, Local Law 16 of 1984, and Local Law 26 of 2004, which required existing office buildings 100 feet or taller to be sprinklered throughout by July 1, 2019. FDNY requires fire safety and emergency action plans in larger office buildings and a certified director to run them. On top of that come elevator category tests, ten-year energy audits and, since December 2024, a wider path to turn older office buildings into housing.
What a New York office building gets asked
- Sprinklers throughoutLocal Law 26 of 2004 set July 1, 2019 as the deadline for existing office buildings 100 feet or taller.
- A director on siteHigh-rise office buildings need an FDNY-certified Fire and Life Safety Director present during business hours.
- Elevator testsA yearly periodic inspection, a yearly no-load Category 1 test and a full-load Category 5 test every five years.
- Energy auditsLocal Law 87 requires an audit and retro-commissioning report once every ten years for buildings over 50,000 square feet.
- ConversionsCity of Yes for Housing Opportunity moved the conversion eligibility date up to 1991.
- TerrorismThe federal backstop runs through December 31, 2027.
The coverage parts are on the office building page, and the city’s facade, garage, emissions and scaffold-law rules are on the New York City commercial property page. This page covers what changes for an office building, as of November 2026.
Local Law 26 and the sprinkler history underwriters ask about
The Department of Buildings tells the sprinkler story in three steps. Local Law 5 of 1973 required existing high-rise office buildings 100 feet or taller to install sprinklers or, instead, compartmentation with stair pressurization. Local Law 16 of 1984 required new office buildings over 75 feet to be sprinklered throughout, without the same exemptions. After the World Trade Center Building Code Task Force found in 2003 that compartmentation and smoke alarms do not protect as well as a full sprinkler system, Local Law 26 of 2004 made sprinklers retroactive for existing office buildings 100 feet or more in height, due July 1, 2019.
A building already fully sprinklered, or required to be, under the 1973 or 1984 laws on October 22, 2004 sat outside the new requirement. For underwriting, that means three questions:
- Which law the building complied under, and whether any floor still relies on the 1973 compartmentation option.
- The final compliance filing and sign-off, so the file shows the building is sprinklered throughout rather than mostly.
- Fire pump and standpipe test dates, because a tower’s sprinklers above the street-pressure floors depend on them.
A fully sprinklered fire-resistive tower is a different risk from one that is not, and the property quote reflects that before anything else.
Fire and life safety directors and the emergency action plan
FDNY requires a Comprehensive Fire Safety and Emergency Action Plan in office buildings that are high-rise or large-area with more than 500 people, that have more than 100 people on floors above or below street level, or that have more than 100 people on one or more high-rise floors. High-rise office buildings also need a Fire and Life Safety Director on site during regular business hours. The director holds an FDNY certificate of fitness, earned through a course at an FDNY-certified school, an Active Shooter and Medical Emergency Preparedness course, a computer exam and an on-site exam in the building itself.
That plan is one of the best liability documents a building has. When a tenant’s employee is hurt during an evacuation, or someone is attacked in a lobby, the defense starts with who was on duty, what drills were run and what the plan said. I ask for:
- The FDNY-accepted plan and the date of the last update.
- Who holds the director certificates, and whether they work for you, the manager or a security contractor.
- The security contract, with its indemnity and the contractor’s certificate naming you as additional insured.
Elevators: two tests on two clocks
The Department of Buildings requires a yearly periodic inspection between January 1 and December 31, done by an approved agency that cannot be affiliated with the company maintaining the elevator, and filed within 14 days. On top of that, a Category 1 no-load safety test is due every year, and a Category 5 test at rated load and speed is due within five years of the last one; independent third-party agencies licensed by the Department perform and witness both, and the filings are due within 21 days.
A tower with dozens of cars is a large equipment breakdown exposure: hoist motors, controllers, drives and the switchgear that feeds them, along with chillers, cooling towers and boilers. Breakdown coverage should carry the repair, any expediting expense and the rents lost while floors cannot be reached. Missed category filings are one of the first things an engineer looks for on a survey.
Local Law 87 audits and the work they lead to
Local Law 87 requires buildings over 50,000 square feet to have an energy audit and retro-commissioning of base building systems and to file an Energy Efficiency Report once every ten years; the filing year follows the last digit of the building’s tax block. Retro-commissioning usually means recalibrating controls, repairing dampers and valves and correcting sequences, which is the same equipment an equipment breakdown underwriter cares about.
Audits lead to projects, and in an occupied office building those projects mean contractors on the roof, in the shafts and in the mechanical rooms. Before work starts:
- Get certificates and endorsements naming you, your manager and your lender as additional insureds, on a primary basis (certificate holder versus additional insured).
- Tell the property insurer about any shutdown of fire protection, hot work or crane lifts.
- Update the values when new plant goes in, so a later loss is settled on the building as it stands.
Office buildings that become housing
The City Council approved City of Yes for Housing Opportunity with modifications on December 5, 2024. The Department of City Planning says it expands non-residential conversions citywide and moves the eligibility date up to 1991, where before many buildings built after 1961, or outside the city’s largest office centers, could not become housing.
A conversion is a long construction job in a building that may still have office tenants on some floors. The insurance usually changes in this order:
- Builder’s risk for the work, with soft costs and delay coverage if the project is financed.
- The existing property policy, told in writing about the construction and the vacant floors, since vacancy conditions can cut back coverage.
- Liability for the owner during construction, usually through a wrap-up or tight contractor requirements, because New York’s labor law puts owners in the path of worker injury claims.
- A residential program once units are delivered, which underwriters treat as a new risk.
Terrorism, umbrella limits and the rent roll
Treasury’s Terrorism Risk Insurance Program requires insurers to make terrorism coverage available on eligible commercial lines, and the current law runs through December 31, 2027. For a recognizable Manhattan tower the lender almost always requires it, and sometimes on a stand-alone policy that also responds to acts not certified under the federal program (do I need terrorism insurance?).
Loss of rents should follow the rent roll and the time a fire-resistive building really takes to restore, including permit time and the order in which floors come back. The umbrella and excess layers stack to the higher of the loan requirement and the largest lease’s requirement (commercial umbrella). If a big tenant is leaving, tell me early: a mostly empty floor plate changes the vacancy picture and the rents limit.
What to send me
- Address, borough, year built, stories, height and square footage.
- Sprinkler compliance: which law, the final filing, fire pump and standpipe tests.
- The FDNY fire safety and emergency action plan and the director’s employer.
- Elevator inspection and category test filings for every car.
- The latest Local Law 87 report and any planned projects.
- A statement of values and the rent roll, with lease expirations and vacant floors.
- Lender insurance requirements and declarations for every current policy, with five years of losses.
Call or text (877) 711-4545. From outside the U.S. or Canada: +1 (424) 552-4545.
Common questions
Do you have an office in New York City?
No. Alishahi Insurance has one office, in Beverly Hills, California. I am licensed in New York and work with New York City building owners by phone, text and online.
Does my New York office building have to be sprinklered?
If it is an office building 100 feet or taller, Local Law 26 of 2004 required full sprinklers by July 1, 2019, unless it was already sprinklered under the 1973 or 1984 laws. New office buildings over 75 feet have had to be sprinklered since 1984.
Who needs a Fire and Life Safety Director in NYC?
High-rise office buildings, hotels and buildings with certain fire alarm systems. The director holds an FDNY certificate of fitness and must be on site during business hours.
How often are elevators tested in a New York City office building?
A periodic inspection every year, a Category 1 no-load test every year, and a Category 5 full-load test within five years of the last one, filed with the Department of Buildings.
What is Local Law 87?
It requires buildings over 50,000 square feet to file an energy audit and retro-commissioning report once every ten years. It is not an insurance filing, but the work it leads to brings contractors into the building.
Can my office building be converted to apartments?
Since December 2024, City of Yes for Housing Opportunity lets many more buildings built before 1991 convert. The project needs builder’s risk, and the rest of the building’s policy has to be told about the work.
Is terrorism insurance required on a Manhattan office tower?
No law requires an owner to buy it, but insurers must offer it and lenders on large towers usually require it. The federal program runs through December 31, 2027.
General information about insuring office buildings in New York City as of November 2026, not legal or engineering advice. FDNY, Department of Buildings and zoning rules change, and the federal terrorism program has an end date; confirm your building’s obligations with the city agencies and your own advisers. Coverage depends on the policy issued. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.