Art Deco apartment building behind palm trees
Warehouse Insurance · Columbus, OH

Warehouse insurance for Columbus distribution buildings

A Columbus distribution building is judged first on what sits in its racks and how the sprinklers were designed for it. Ohio rewrote its fire code in November 2025, wrote its own rules for lithium-ion battery storage into it, and the Columbus Division of Fire permits high-piled storage in existing buildings through a questionnaire that reads like an underwriter’s checklist. I place Columbus warehouse programs from my office in Beverly Hills, California, by phone, text and online; Alishahi Insurance has no office in Ohio.

By Sam Alishahi · CA Insurance License #4348151 · Reviewed November 2026 · How this page is researched

Columbus warehouses at a glance

Three papers settle most of a Columbus warehouse submission: the city’s high-piled storage permit file, with its commodity and plastics answers; a list of any lithium-ion battery stock, indoors or in the yard; and the receipt or 3PL contract that sets your liability for customers’ goods. Comp in Ohio comes from the state fund, so the private side of the program is property, liability, stop-gap and umbrella.

What is different about a Columbus warehouse

  • A new state fire codeThe 2025 Ohio Fire Code took effect November 20, 2025, replacing the 2017 edition. It is built on the 2021 International Fire Code, with Chapter 12 taken from the 2024 edition, and it applies statewide.
  • Ohio’s own battery sectionThe State Fire Marshal added Section 323 for lithium-ion and lithium metal batteries, with a permit above 15 cubic feet and limits on outdoor storage.
  • A city permit for existing buildingsThe Columbus Division of Fire’s Fire Prevention Bureau permits high-piled storage in existing facilities; buildings still in design go through the Department of Building and Zoning Services.
  • Ohio’s warehouse statuteRevised Code 1307.204 sets the warehouse’s duty of care, and 1307.202(C) makes receipt terms ineffective to the extent they impair it.
  • Comp from the stateOhio workers’ comp comes from the Bureau of Workers’ Compensation, unless an employer qualifies to self-insure, and it leaves employer’s liability to be bought privately.

The coverage parts are on my warehouse insurance page; this page covers what Columbus and Ohio add, as of November 2026.

The Columbus high-piled storage permit, read as an underwriter would

The Fire Prevention Bureau says its permit process sets a benchmark of a facility’s current storage practices, used for comparison at later inspections. If the review finds deficiencies, the bureau works out a plan of action with a timeframe based on how many there are, how severe they are and what they cost to fix. The questionnaire asks for:

  • Commodity class for everything stored, and where each class sits; the packet warns that a misclassified commodity can overtax a sprinkler system designed for the wrong class.
  • Maximum storage height, measured from the floor to the top of the goods, not to the top shelf, plus clear height to the roof deck and to its supports.
  • Rack details: single, double or multiple row, depth, width, aisle widths, and the longitudinal and transverse flue spaces in inches.
  • Smoke vents, curtain boards and mechanical smoke removal, counted and sized.
  • Sprinkler density, existing and required, with an agreed action plan if they don’t match.
  • Access doors from the drive into the storage area, keyed for fire department entry.

Those are the answers a property underwriter needs, so I ask for a copy of what you filed. One caution: the packet was last revised in 2021 and still cites the 2017 Ohio Fire Code, so confirm current requirements with the bureau before you re-rack.

Plastics: the percentage that can change the sprinklers

Columbus asks any facility storing plastics to complete a separate plastics questionnaire. Group A plastics need the percentage of expanded plastic, by weight or by volume, and the percentage of unexpanded plastic by weight, all on the same basis: per pallet load or per carton, not one of each. The bureau’s own example: a pallet of bicycles might be about a quarter plastic, while computers may be as much as 75 percent.

The packet’s point is that the difference in percentage can be the difference in whether, and how, the building has to be sprinklered. An e-commerce or fulfillment operation with thousands of mixed products is where this goes wrong: the sprinklers were designed for cartoned goods, then a customer’s line of plastic housewares fills three aisles. Underwriters ask the same question at renewal. Keep the commodity list current, tell me when a new customer’s goods arrive, and a building that was rated for one class doesn’t get rated after a loss for another.

Ohio’s lithium-ion rules, indoors and in the yard

Section 323 of the 2025 Ohio Fire Code covers storage, use and charging of lithium-ion and lithium metal batteries. Batteries installed in, or packed with, the equipment they power are exempt, and so are batteries in original retail packaging rated at 300 watt-hours or less (25 grams of lithium metal or less). Beyond that:

  • Permit and plan: more than 15 cubic feet needs a permit, and the fire safety plan must say what staff do when a battery fire is detected.
  • Indoor storage areas: a technical report, approved before the permit, on thermal runaway gases and the sprinkler design basis; 2-hour fire barriers when the building has other uses, with exceptions; sprinklers; air-aspirating or radiant energy detection; explosion control if the report calls for it.
  • Outdoor storage: at least 20 feet from buildings, lot lines, public ways and exits, or 3 feet behind a 2-hour wall extending 5 feet above and to the sides, or in an approved 2-hour portable structure. Each outdoor area is limited to 900 square feet and 10 feet high, with radiant energy detection.

The yard is where this meets your policy. Returned or damaged batteries are often staged outside, and many property forms limit coverage for property in the open or in trailers. I schedule the yard with its own limit and check that a battery fire there isn’t excluded as pollution cleanup.

Cold storage, ammonia and the power

  • Federal thresholds: an ammonia refrigeration system with 10,000 pounds or more of anhydrous ammonia falls under OSHA’s process safety management standard and the EPA’s risk management program. Underwriters ask for the PSM and RMP files, the mechanical integrity records and the last compliance audit.
  • Spoilage: stock lost when a compressor fails is an equipment breakdown claim only if the policy includes spoilage. Loss from a utility outage off the premises needs utility services coverage (power outage and spoilage).
  • Ammonia on the goods: a release can contaminate stock that never warmed up; I read how the pollution exclusion and the spoilage coverage treat it.
  • Boilers and pressure vessels: Ohio’s certificate rules are on my Columbus commercial property page.

Customers’ goods, contracts, stop-gap and the umbrella

Ohio’s Revised Code 1307.204 is the state’s version of the duty-of-care rule on my warehouse page, and 1307.202(C) adds that a receipt cannot contract that duty away. A per-pound cap in the receipt is allowed; a clause promising no liability for your own negligence is not. A 3PL agreement often goes further than the receipt, making you responsible for shrinkage, mis-picks or loss regardless of fault, and a legal liability form doesn’t pay for that. I read the agreement before I set the warehouse legal liability limit.

  • Forklifts: powered industrial trucks are mobile equipment, covered for liability on the general liability policy, with the trucks themselves on an equipment schedule.
  • Landlords and lenders: the lease names who must be an additional insured and who needs a waiver of subrogation; the lender wants a mortgagee clause on the building.
  • Stop-gap: BWC coverage does not include employer’s liability, so it goes on the general liability policy, and the umbrella should list it as underlying (Columbus workers’ comp, how the BWC works).

Hauling out of Rickenbacker is a separate placement: Columbus trucking fleets.

What to send me

  • Each building’s address, year built, construction, roof type and age, and square footage.
  • The fire file: your Columbus high-piled storage permit, questionnaire and floor plans, the plastics questionnaire, and the sprinkler design.
  • Battery stock: where it is kept, indoors or out, any Section 323 permit and technical report.
  • Cold storage: the refrigerant, the ammonia charge and your PSM and RMP status.
  • Contracts: receipt form, 3PL agreements and the lease’s insurance clause.
  • A statement of values for building, racking, conveyors, stock at its contract value and business income, plus five years of loss runs.

Call or text (877) 711-4545.

Common questions

Do you have an office in Columbus?

No. Alishahi Insurance has one office, in Beverly Hills, California. I am licensed in Ohio and work with Columbus warehouse owners and operators by phone, text and online.

Do I need a permit for high-piled storage in a Columbus warehouse?

The Columbus Division of Fire marks high-piled storage “Permit Required.” For an existing building you file the application, the questionnaire and floor plans with the Fire Prevention Bureau; buildings still in design go through Building and Zoning Services.

Does Ohio’s fire code regulate lithium-ion battery storage?

Yes. Section 323 of the 2025 Ohio Fire Code requires a permit above 15 cubic feet, a technical report for indoor storage areas, and limits outdoor storage areas to 900 square feet and 10 feet high, with set distances from buildings and lot lines.

Why does the fire department ask what percentage of my stock is plastic?

The share of Group A plastic in a pallet or carton can change the commodity class, and with it whether and how the building must be sprinklered. Underwriters ask the same question.

Can my warehouse receipt limit what I owe a customer in Ohio?

A receipt or storage agreement can cap damages, but under Revised Code 1307.202(C) its terms cannot impair the duty of reasonable care in 1307.204, and a cap does not apply to conversion.

Who sells workers’ comp to a Columbus warehouse?

Only the Ohio Bureau of Workers’ Compensation, unless the employer qualifies to self-insure. Employer’s liability is not included, so it is bought privately as stop-gap, usually on the general liability policy.

General information about insuring warehouses and distribution buildings in Columbus as of November 2026, not legal or engineering advice. The Ohio Fire Code, Columbus Division of Fire permit procedures, federal process safety rules and BWC rules change; confirm current requirements with the Fire Prevention Bureau, the State Fire Marshal and counsel. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.

Columbus warehouses

Send the storage permit and the commodity list.

With the high-piled storage file, any battery stock, your contracts and five years of losses, I can quote the property, legal liability, general liability with stop-gap and the umbrella together.

Alishahi Insurance · Saman Alishahi, independent insurance broker, California License #4348151, 439 N Canon Dr, Penthouse, Beverly Hills, CA 90210. Serving Columbus from the Beverly Hills office; no office in Columbus. General information, not a quote or a promise of coverage.

Get a quote

Tell me how to reach you. I’ll take it from there.

Takes about 30 seconds. Your next step comes by email, and you get an update at every step until your quotes are ready.

(877) 711-4545

Answered 24/7 · CA License #4348151

Only your name, phone and email are required; every question here is optional. This is a request for insurance: Alishahi Insurance (Saman Alishahi, licensed insurance agent) will contact you about it by email, and by text if you check the box. Sending this form doesn’t bind coverage; coverage starts only when it’s confirmed in writing.

Not shopping yet?

Get a reminder before your renewal.

Tell me when your policy renews and I’ll email you about six weeks before, when it’s worth comparing. One email, no calls.