Four sets of documents answer most of what an underwriter asks here: the approved high-piled storage plans with the sprinkler design, a commodity list that shows any lithium-ion batteries, the operator’s WAIRE filings, and payroll by WCIRB class with five years of loss runs. With those in hand, the talk is about limits and terms, not open questions.
What makes an Inland Empire distribution center different
- A named warehouse regionAB 98 defines a warehouse concentration region: the unincorporated areas of Riverside and San Bernardino counties and the cities of Chino, Colton, Fontana, Jurupa Valley, Moreno Valley, Ontario, Perris, Rancho Cucamonga, Redlands, Rialto, Riverside and San Bernardino.
- An air rule for big buildingsSouth Coast AQMD Rule 2305, the WAIRE program, reaches warehouses with 100,000 square feet or more of indoor floor space in one building.
- Batteries as a high-hazard commodityThe 2025 California Fire Code, in effect since January 1, 2026, classes lithium-ion batteries not installed in the equipment they power as high-hazard.
- Heat on the floorCal/OSHA’s indoor heat rule starts at 82 degrees Fahrenheit with employees present.
- A fault zone next doorCaltech’s Southern California Earthquake Data Center puts probable magnitudes on the San Jacinto fault zone at 6.5 to 7.5, with 100 to 300 years between surface ruptures on each segment.
The coverage parts are on my warehouse insurance page; this page covers what the two counties add, as of November 2026.
Building values, earthquake and the income behind the box
A distribution center is insured on a statement of values, and at this size the schedule shapes the placement as much as the rate. I ask for the building at today’s replacement cost, then what owners forget to list: racking and mezzanines, conveyors, dock equipment, rooftop solar, chargers, the office build-out, and stock valued the way your contracts say. One building’s value can be more than a single insurer wants to carry, so the limit may be shared or layered, and every layer needs the same valuation and wording (excess property layers).
The Department of Insurance’s small-business guide names earthquake and flood as two common perils excluded under open-perils coverage, so a tilt-up warehouse needs its own commercial earthquake or difference-in-conditions policy, usually with a percentage deductible. Underwriters read the year built, how the roof is tied to the walls, the soil and any engineering report. The U.S. Geological Survey recorded a magnitude 5.4 earthquake five kilometers south of Chino Hills on July 29, 2008.
Business income is where a large loss gets expensive. Reopening can mean a building permit, re-approved storage plans and a sprinkler sign-off before racks are loaded again, so I size the period of restoration to that sequence, not a round twelve months, and add extended indemnity for customers who leave while you rebuild (business interruption).
In-rack sprinklers and what the fire department reviews
The 2025 California Fire Code ties warehouse sprinklers to NFPA 13 and lets the fire code official ask for more:
- Tall shelving: shelf storage over 12 feet but under 15 feet follows NFPA 13; at 15 feet or more it needs special fire protection, such as in-rack sprinklers.
- More on request: for storage taller than the code’s table allows, the official can require protected steel columns, higher sprinkler density, hose connections, or additional in-rack sprinklers with no reduction in ceiling density.
- Plastic pallets: those listed to FM 4996 or UL 2335 are treated as wood pallets in the sprinkler design.
San Bernardino County Fire’s high-piled storage checklist shows what a plan reviewer wants: the commodity classification, the storage method and shelving type, where high-hazard goods sit, the valves for ceiling and in-rack sprinklers, and any banded or encapsulated goods, plus rack plans and a commodity report on request. I send underwriters the same package, because it shows whether the sprinklers match what is on the racks.
Lithium-ion batteries in stock and on the forklifts
Battery stock changes a warehouse’s fire file. Section 320 of the 2025 California Fire Code adds:
- Permit: more than 15 cubic feet of lithium-ion or lithium metal batteries needs one; new or refurbished batteries installed in, or packed with, the equipment they power are exempt.
- Engineering report: an indoor battery storage area needs a technical report, approved before the permit issues, on the deflagration risk from thermal runaway gases and the basis of the sprinkler design, tied to full-scale fire testing or another approved method.
- Construction and detection: 2-hour fire barriers in a building with other uses, with exceptions; sprinklers; air-aspirating smoke or radiant energy detection; explosion control where the report calls for it.
- Lower charge: at an approved, verified state of charge of 30 percent or less, the report, barriers and explosion control are not required.
Charging is growing too: where AB 98’s design standards apply, forklifts must be zero-emission by January 1, 2030, or 2028 at a Tier 1 building, where operationally feasible. And if a customer’s goods turn out to be a hazard you had no notice of, Commercial Code 7206 lets the warehouse sell or dispose of them on reasonable notification to everyone known to claim them.
AB 98: siting and design rules written for this region
AB 98 (2024), amended by SB 415 (2025), sets statewide warehouse standards, with provisions of its own for this region. Starting January 1, 2026:
- Non-industrial land: a new or expanded warehouse in the region on land not zoned industrial, or needing rezoning, must keep loading bays at least 500 feet from the property line of the nearest sensitive receptor, such as a home or school, with a separate truck entrance and a buffer. At 250,000 square feet or more it adds the Tier 1 elements, including microgrid-ready switchgear and chargers at a tenth of passenger parking spaces.
- What counts as an expansion: 20 percent or more over the existing square footage, not counting office space.
- Older projects: the chapter does not apply to a logistics use development whose local entitlement process began before September 30, 2024.
Cities and counties in the region had to add truck routes to their general plans by January 1, 2026; on October 5, 2026 the Attorney General sent an enforcement advisory to eight that had not: Chino, Moreno Valley, Perris, Rancho Cucamonga, Rialto, Riverside, Ontario and Riverside County. An expansion needs builder’s risk bound before ground breaks, and the switchgear and chargers it adds go on the property schedule.
WAIRE: the air district’s yearly obligation
Rule 2305 puts the yearly obligation on an operator using at least 50,000 square feet of a building with 100,000 square feet or more. It earns WAIRE Points set by weighted truck trips, with each Class 8 trip counted two and a half times, and files its annual report within 30 days after January 1. The phase-in that began with the largest buildings in 2022 is over: from 2026 the annual variable is 1.0 for every size group. Points come from a menu that includes zero-emission yard trucks, chargers and solar, an approved custom plan, or a mitigation fee.
Equipment bought to earn points belongs on the property schedule, with equipment breakdown for the electrical gear. Keep truck-trip records off site too: if a fire destroys them, the rule substitutes a formula of operating days, building size and a fixed trip rate.
Workers’ comp: the right class, the mod and the heat rule
- Classification: the WCIRB puts fee-based storage of general merchandise in 8292, with pick-up and delivery in 7219(1), Trucking Firms. Fee-based packaging and fulfillment is 8018; climate-controlled storage is 8291(1) below 45 degrees or 8291(2) at or above it. A misclassified pick-and-pack floor surfaces at audit.
- The mod: the experience period runs from four years and nine months to one year and nine months before your rating date, so a bad injury year shows up in three mods in a row (how the mod works).
- Injury rates and quotas: under Labor Code 2107, an annual injury rate at least one and a half times the warehousing average gets the site referred to the Labor Commissioner, who decides whether to investigate under the AB 701 quota law.
- Indoor heat: Title 8 section 3396 applies at 82 degrees, with cool-down areas kept below 82 unless infeasible. At 87 degrees or a heat index of 87, the employer must also measure, record and control heat. The brief-exposure exception does not cover loading or unloading shipping containers.
Customers’ goods, the receipt, the fleet and the umbrella
The duty of care and the receipt’s limit of liability are on the warehouse page. The receipt also has a statutory checklist: under Commercial Code 7202, a receipt that omits the facility location, date, unique identification code, delivery terms, storage rate, description of the goods, signature, any warehouse ownership of the goods or the advances it claims a lien for leaves the warehouse liable for damage the omission causes.
If you own the inventory, insure it on your property policy or a stock throughput policy that follows it from supplier to delivery, so a loss in a trailer at the dock is not argued over by two policies. Yard tractors and trucks go on a fleet policy (fleet guide). General liability is the smaller part of the program. The lease’s insurance clause sets the umbrella limit, the additional insured wording and any waiver of subrogation, and every layer must follow the auto, liability and employer’s liability below it.
What to send me
- A statement of values by building, including racking, chargers, stock and business income.
- Construction: year built, square footage, clear height, wall and roof type, and any seismic report.
- The fire file: storage plans and permit, sprinkler design, the latest inspection, any battery permit or report.
- A commodity list by customer, with high-hazard and temperature-controlled goods marked.
- Contracts: your warehouse receipt form, sample storage agreements and the lease’s insurance clause.
- Payroll by class, your mod, and five years of loss runs on every line.
- Air and siting paperwork: WAIRE filings and any AB 98 expansion plans.
Common questions
Who insures large distribution centers in the Inland Empire?
Admitted insurers and surplus lines markets both write them, and a high-value building may be shared among several. Who quotes depends on how the sprinkler design matches the commodities, the storage permit and the loss history.
Does AB 98 apply to my existing warehouse in Ontario or Fontana?
Its standards apply to new or expanded warehouses from January 1, 2026; an expansion adds 20 percent or more to the existing square footage, not counting offices. Projects whose entitlement process began before September 30, 2024 are outside it.
Do I need a fire permit to store lithium-ion batteries in a warehouse?
Yes, under the 2025 California Fire Code, once more than 15 cubic feet of non-exempt lithium-ion or lithium metal batteries accumulate. An indoor storage area also needs an approved technical report first.
What is WAIRE, and who has to file?
It is South Coast AQMD Rule 2305. An operator using at least 50,000 square feet of a building with 100,000 square feet or more earns WAIRE Points each year and files an annual report within 30 days after January 1.
Which workers’ comp class code fits a California warehouse?
Fee-based storage of general merchandise is 8292, with pick-up and delivery drivers in 7219(1). Fee-based packaging and fulfillment is 8018, and cold or climate-controlled storage is 8291.
Does the indoor heat rule apply to my warehouse in Riverside or San Bernardino County?
Yes, in any indoor work area at 82 degrees Fahrenheit or more with employees present, with added duties at 87 degrees or a heat index of 87.
General information about insuring warehouses and distribution centers in Riverside and San Bernardino counties as of November 2026, not legal or engineering advice. Fire code adoption and local amendments, AB 98, South Coast AQMD Rule 2305, WCIRB classifications and Cal/OSHA rules change; confirm current requirements with your fire department, planning department, the air district and counsel. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.