California’s standard form fire policy insures against loss by fire and lightning, so wildfire damage is a fire claim. Earthquake and flood are different: the Department of Insurance names both as common exclusions, and FEMA counts mudflow off a burn scar as flood. In these three cities the questions I bring to an underwriter are whether the building is old brick or wood over parking, how far away the brush is, and what drains toward it from the slope above.
What changes at each city line
- Pasadena soft-storyOrdinance No. 7345, adopted May 20, 2019, reaches older wood-frame buildings whose ground floor is open for parking or similar space.
- Pasadena brickTitle 14.06 sets requirements for buildings built before 1934 with unreinforced masonry bearing walls, while protecting qualified historic buildings.
- Glendale brushProperties in the very high fire hazard zone are subject to yearly inspection and must keep 100 feet of defensible space.
- Burbank brushThe very high zone requires 200 feet of clearance in total, with inspections beginning each July.
- The Eaton FireBy CAL FIRE’s count it destroyed 9,419 structures after starting in Altadena on the evening of January 7, 2025.
- Three faultsCaltech’s earthquake data center places the Verdugo fault near Burbank and Glendale, the Sierra Madre fault zone near Altadena and Sunland, and the Raymond fault near South Pasadena and San Marino.
Old brick and wood over parking
When the state Seismic Safety Commission surveyed local unreinforced masonry programs in 2006, Pasadena listed 759 such buildings, 131 of them historic, and reported a mitigation rate of 95 percent, noting that 125 might qualify for the historic label. Glendale listed 703 under a mandatory strengthening program and Burbank 53, each reporting a rate of 100 percent. Pasadena’s current ordinance, Title 14.06, aims to reduce the hazard from pre-1934 buildings with unreinforced masonry bearing walls without losing or degrading qualified historic buildings. On any brick building I ask for the strengthening permit or engineer’s letter, and whether the building is designated historic.
Pasadena added a mandatory soft-story program in 2019. Its text reaches any wood-frame building whose permit application is dated November 12, 1976 or earlier and whose ground floor or basement is open for parking or similar use. The exceptions are single-family homes, residential parcels of four or fewer units and concrete podium levels, so a wood office or mixed-use building over parking can be inside it. Notices went to Priority 1 owners on December 5, 2019, Priority 2 on December 2, 2020 and Priority 3 on March 3, 2021. From the notice, owners have one year for an optional screening form, four years for plans and a permit after Resolution No. 9774 added twelve months, and seven years to finish. City staff estimated about 493 buildings needing evaluation and possible retrofit.
A retrofit that is still open when a fire hits does not come free with the claim. California’s standard fire form in Insurance Code section 2071 makes no allowance for what a building or zoning law adds to the cost of repairing or rebuilding, so ordinance or law coverage has to be added to the policy.
The Eaton Fire, the burn scar and flood
CAL FIRE’s incident record puts the start of the Eaton Fire at 6:18 p.m. on January 7, 2025, close to the corner of Altadena and Midwick drives. It burned 14,021 acres, destroyed 9,419 structures, damaged 1,076 and killed 19 civilians, and its structure counts combine residential, commercial and other buildings. That January the City released a citywide business impact survey that gathered feedback from 557 local businesses.
On January 22, 2025 Pasadena warned that the burn scar left the area more susceptible to debris flows, flooding and erosion, and suggested barriers to steer water and debris away from buildings. In late October 2026 Los Angeles County Public Works still carried the Eaton burn area, covering Pasadena, Altadena, Arcadia and Sierra Madre, on its debris and mudflow forecast. FEMA treats mudflow, a river of liquid mud on normally dry land, as flood under the federal flood policy, but excludes landslide. A federal flood policy on a non-residential building stops at five hundred thousand dollars, with a second five hundred thousand dollars available for contents, and it generally takes 30 days to take effect, so it has to be bought before the rain. Burn-scar mudflow and flood insurance.
A building that cannot be used after a fire also loses rent. The Department of Insurance guide says loss of rents coverage answers for the rental income an owner loses while the building is too damaged to occupy, and the standard fire form pays nothing for business interruption unless that coverage is added.
Brush clearance and the 2025 fire map
On March 24, 2025 the State Fire Marshal put out updated Fire Hazard Severity Zone maps for Glendale and Burbank, now graded moderate, high or very high. Glendale’s fire department explains that under state law the city must adopt them within 120 days and may raise a classification but not lower it. In Glendale, property in the very high zone is subject to yearly inspection and must keep 100 feet of defensible space, new construction must meet the wildland-urban interface building rules, and a parcel touching two zones is treated as the stricter one. Burbank asks for 200 feet of clearance in total in its very high zone, with native brush cut back by half from 100 to 200 feet; letters go out in May, clearing is due by the end of June and inspections start in July.
The La Tuna Fire started September 1, 2017 at Lowell Avenue and the 210 freeway in the Verdugo Hills and burned 7,194 acres; CAL FIRE lists the Los Angeles and Burbank fire departments as the agencies in charge. For a commercial building near the Verdugo Mountains, the San Rafael Hills or the Arroyo Seco, I ask for the parcel’s zone, the last brush inspection result and dated clearance photos.
When no standard insurer will write a building, the California FAIR Plan’s commercial policy is the fallback. The Plan’s commercial form is limited to fire, lightning and internal explosion, and vandalism can be bought on top; eligible risks include offices, retail stores, manufacturers, buildings under construction and apartment buildings of five or more units. Since the Insurance Commissioner’s 2025 approval, a FAIR Plan commercial policy can reach twenty million dollars on one building, with one hundred million dollars as the most for a single location. FAIR Plan and difference in conditions coverage in Los Angeles.
Three faults along the foothills
The Southern California Earthquake Data Center at Caltech lists the Raymond fault as about 26 kilometers long and mainly left-lateral, rates it for probable magnitudes between 6.0 and 7.0, and says the 1988 Pasadena earthquake was apparently on it. The Sierra Madre fault zone, about 55 kilometers long, passes near Sunland, Altadena and Sierra Madre and carries the same 6.0 to 7.0 estimate. The Verdugo fault is a reverse fault about 21 kilometers long near Sun Valley, Burbank and Glendale, rated at 6.0 to 6.8.
The property policy does not answer for any of these faults, because earthquake falls under the earth movement exclusion the Department of Insurance describes as common. The California Earthquake Authority sells only homeowner, condo unit, mobilehome and renter policies, so the 5 to 25 percent deductibles in the Department’s earthquake guide describe homes, not commercial buildings. A commercial earthquake policy is written separately, and on each quote I show you the deductible and the value it is measured against. Commercial earthquake insurance.
After a large loss: deadlines, value and renewal
- Time to sue: a suit on the policy has to start within 12 months of the loss, a window that stretches to 24 months for a loss tied to a state of emergency under the Government Code.
- Appraisal: if the disagreement is over actual cash value or the amount of loss, either of you can put a demand for appraisal in writing; each then picks an appraiser within 20 days, and the process stays informal unless both agree otherwise.
- Vacancy: the same form stops covering a building left vacant or unoccupied beyond 60 straight days, unless a written provision in the policy changes that. A building emptied by a fire or a slow repair can cross that line. Vacant building insurance.
- Equipment: the Department’s guide treats HVAC systems as machinery and warns that boiler and machinery losses are excluded from most commercial forms. Equipment breakdown.
- Non-renewal: Insurance Code section 678.1 entitles you to a written notice, reasons included, landing between 60 and 120 days ahead of expiration, both for a flat non-renewal and for a renewal that cuts limits or coverage, raises deductibles or lifts the rate more than 25 percent.
What to send me
- Address and city, because the retrofit and brush rules differ in each one.
- Construction details: year built, stories, floor area and frame, with any brick strengthening or soft-story permit and the engineer’s letter.
- Historic status, if the building is designated.
- Brush and slope: fire hazard zone, the last brush inspection result, clearance photos and any debris barriers.
- Tenant list or rent roll, and any space empty since the fire.
- Updates: the year of the last roof, wiring, plumbing and HVAC work, and sprinkler coverage.
- Declarations pages for the policies in force and five years of loss history, including any Eaton Fire smoke or ash claims.
I work as an independent broker out of Beverly Hills. Background reading: commercial property coverage, office building insurance and mixed-use building insurance.
Common questions
Who insures commercial buildings near the Eaton Fire burn area in Pasadena?
I start with standard insurers and use the surplus lines market when they decline. For eligible building types the California FAIR Plan is a named peril fallback covering fire, lightning and internal explosion, and the other perils go on a separate policy.
Does commercial property insurance cover mudflow from the Eaton burn scar?
Not on its own. FEMA treats mudflow as flood under the National Flood Insurance Program policy, which is bought separately and generally takes 30 days to start, and landslide is excluded there too.
Does Pasadena’s soft-story ordinance apply to commercial buildings?
Its text can reach them. It covers wood-frame buildings whose permits date to November 12, 1976 or earlier, where the ground floor is open for parking or similar use, and the only exceptions are single-family homes, residential parcels of four or fewer units and concrete podium levels.
How do I insure an old brick building in Glendale or Burbank?
Start with the strengthening record. The Seismic Safety Commission’s 2006 survey listed both cities with mandatory strengthening programs for unreinforced masonry, and I send the retrofit permit or the engineer’s letter with the submission.
How much brush clearance does Burbank require in the hills?
In the very high fire hazard zone, 200 feet in total, with native brush reduced by half between 100 and 200 feet. Letters go out in May, clearing is due by the end of June and inspections start in July.
How long do I have to sue over a commercial fire claim in California?
Twelve months from the start of the loss under the standard fire form, extended to 24 months when the loss relates to a state of emergency as the Government Code defines it. Appraisal is available when the dispute is over the amount of loss.
Written as general information in November 2026 for owners of commercial buildings in Pasadena, Glendale and Burbank, and not legal or engineering advice. Each city sets its own retrofit and brush rules and the state sets the fire maps, and both change; check your building with the city’s building and fire departments. What is covered depends on the policy issued. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.
