City of San Diego construction contracts claim any higher limits you carry, make excess policies follow the primary's endorsements and require the same liability coverage for ten years after completion. On public work, prevailing-wage payroll and certified payroll drive the comp audit. And San Diego County has 10,987 active contractor licenses with a comp exemption on file, more than any county but Los Angeles, ahead of the January 1, 2028 change.
What a City of San Diego construction contract asks for
The City's construction contracts replace the Greenbook's insurance section with Section 5-4 of the City's Supplementary Special Provisions; the version I read is dated May 2022. Certificates and endorsements are due when the City issues its Notice of Intent to Award, and neither you nor your subs may start work until the City approves them. The terms that matter most for a large program:
- Your higher limits are the City'sIf you carry broader coverage or higher limits than the minimums, the City is entitled to them, and proceeds above the minimums are available to it. An umbrella bought for private work stands behind a City job too.
- Excess follows formAny policy providing excess coverage must follow the form of the primary policies, endorsements included.
- Ten years after completionThe liability policy, naming the City for both ongoing work and completed operations, with defense costs outside the limits, must be kept in the same or equivalent form for at least ten years after the work is done. California uses the same ten years for new-home defect actions under Civil Code 941, the time limit in the Right to Repair Act.
- CompBy signing, you certify you'll comply with Labor Code 3700 before work begins; the policy carries employer's liability and a waiver of subrogation for losses arising from your work for the City.
- Retentions and priceYou pay and disclose every deductible and self-insured retention, the City may review them, and insurance cost belongs in your bid price. If the Engineer asks for coverage the contract doesn't require, the City reimburses the added premium without markup.
- Insurers and noticeRated A-, VI or better by A.M. Best, and authorized in California; surplus lines only from insurers on the state's LASLI list. Policies give 30 days' notice of cancellation or non-renewal, 10 for non-payment, and you tell the City 30 days before any material change.
Because the City takes whatever you carry, I check that each umbrella and excess layer's own additional insured and primary wording reaches the City, rather than relying on the certificate. How umbrella layers stack.
Work on San Diego Bay and Mission Bay
Waterfront jobs can bring federal compensation law into the program. A 2004 City Attorney memorandum on the City's public works contracts recommended maritime language requiring coverage for claims under the Longshore and Harbor Workers' Compensation Act, the Jones Act and general maritime law on projects involving a commercial pier, wharf, dry dock, terminal, building way or marine railway, or bridge work from a barge or platform. That coverage is asked for in addition to the state comp policy, so when a contract carries the clause I add it before the crew mobilizes. Who the longshore act reaches: USL&H and the Jones Act; crews that work from the water: marine contractor insurance.
The SDCCD wrap-up and what it leaves to you
The San Diego Community College District insures eligible contractors on approved projects through an owner-controlled insurance program run under the Statewide Educational Wrap-Up Program. The district buys it and pays the premiums, so bids leave those insurance costs out. It covers primes and subs of every tier who do direct labor on site, plus temporary labor or leasing firms working there; consultants, vendors, suppliers, delivery drivers, truckers, surveyors, off-site fabricators and off-site service firms are outside it. The program bundles comp with employer's liability, general liability, builder's risk on the project and contractors pollution liability, but only for work at the designated site after your enrollment is approved, and enrolled contractors report payroll monthly online.
What that does to your own program (wrap-ups explained):
- Two payroll streams: the district job's payroll goes on the monthly wrap reports and comes out of your own comp estimate; everything else stays on your policy and its audit. The wrap insurer still reports your comp payroll and losses on the project to the rating organization (Insurance Code 11751.82).
- Your own vehicle and off-site coverage: the district says enrolled contractors keep their own coverage for off-site operations and vehicle use.
- Builder's risk: on this program the district insures the project, and builder's risk is the coverage it names as carrying a deductible, so ask who absorbs it before you price the job. On private work the contract decides who buys it; how builder's risk is written.
Comp on prevailing-wage payroll
Public work runs on payroll records the state can read. To register with DIR (Labor Code 1725.5), a contractor shows that its comp policy reaches the employees it puts on prevailing-wage jobs. Labor Code 1776 then requires certified payroll showing each worker's work classification, straight-time and overtime hours each day and week, and the actual per diem wages paid, verified under penalty of perjury. On most projects it is filed electronically with the Labor Commissioner, and the public can search it with confidential details removed.
That same record feeds your comp audit. The WCIRB splits many building trades into dual-wage pairs, and the high-wage code holds only if the final audit verifies the regular hourly wage. Fringe benefit payments the employer makes count toward that wage unless they are excludable from payroll; allowances, reimbursed expenses and the premium portion of overtime don't count. On September 1, 2026 the thresholds rose on 25 pairs, including electrical wiring, plumbing, HVAC equipment and ductwork, carpentry, steel framing, concrete flatwork and excavation, so I check last year's rates against the new lines before the estimate goes in.
Subs are the other audit risk. With limited exceptions, every licensed contractor must carry comp from January 1, 2028 (the 2028 change). San Diego County has 21,613 active licenses in CSLB's October 3, 2026 file, and 10,987 of them, 51 percent, list an exemption (county figures). Until 2028 I ask for each sub's certificate or exemption before it starts; after that date the exemption stops being an option for nearly all of them.
Equipment and trucks under CARB
A City of San Diego contract can carry an attachment on CARB's In-Use Off-Road Diesel-Fueled Fleets Regulation, which covers self-propelled off-road diesel vehicles of 25 horsepower or more, rented and leased units included. Since January 1, 2024, a prime contractor can't hire a fleet without a valid Certificate of Reported Compliance for that fleet and its listed subs; the City wants copies within 10 days of its Notice of Intent to Award, and you keep them for three years after completion. Each year between March 1 and June 1 you collect new certificates from fleets still under contract, allow only certified fleets on your sites and report noncompliance to CARB within five business days. The rule also bars adding Tier 3 machines to any fleet and requires renewable diesel, with limited exceptions.
On the road, Clean Truck Check reaches almost every heavy diesel or alternative-fuel truck above 14,000 pounds GVWR. Since January 1, 2023, roadside emissions monitors paired with license plate readers flag possible high emitters; once a Notice to Submit to Testing arrives, the owner has 30 calendar days to submit a passing test; from October 2027, OBD-equipped trucks test four times a year. Advanced Clean Fleets, as amended, leaves private fleets out, according to CARB's guidance. I keep the equipment floater, the auto schedule and your CARB reporting on one unit list, with MVRs on every driver and pull-notice enrollment for Class A and B drivers (fleet details).
What to send me
- Licenses and registration: CSLB number and classifications, DIR registration, and any City prequalification.
- Payroll: estimates by WCIRB class with hourly rates for dual-wage trades, and certified payroll for current public jobs.
- Losses: loss runs for the last five years and the latest experience rating form.
- Units: trucks with VIN and GVWR, off-road equipment with its CARB reporting status, and the driver list.
- Contracts: the City's insurance section, the district's OCIP manual or the owner's requirements for the job you're bidding, noting any work over water.
- Current policies: comp, auto, equipment, umbrella and excess declarations.
Common questions
Who insures larger contractors in San Diego?
I place San Diego contractors with crews, fleets and equipment with admitted carriers first and go to surplus lines markets when a trade or loss record needs them. City of San Diego contracts accept a surplus lines insurer only if it is on California's LASLI list and meets the City's rating floor.
Will a City of San Diego construction contract reach my umbrella?
The contract sets minimum limits, but if you carry higher limits the City is entitled to them, and any excess policy must follow the primary's endorsements. In practice, the umbrella you already carry stands behind every City construction job.
Does the SDCCD wrap-up cover my trucks and my yard?
No. The district's program covers on-site work at enrolled projects after approval; you keep your own coverage for vehicles and off-site operations.
Do I need USL&H coverage for a job on San Diego Bay?
It depends on where and how the crew works. The City's maritime contract language, as a 2004 City Attorney memorandum describes it, asks for longshore, Jones Act and maritime coverage on pier, wharf, dry dock or barge work, in addition to state comp.
How does prevailing wage affect my workers' comp in San Diego?
Comp premium is figured on payroll, so prevailing wages raise the base, and fringe benefit payments can count toward the hourly wage that decides a dual-wage code. Keep certified payroll and time records together, since the high-wage code holds only if the wage is verified at audit.
Does CARB's Off-Road rule affect which equipment fleets I can hire?
Yes. Since January 1, 2024, a prime contractor may not hire an off-road diesel fleet without a valid Certificate of Reported Compliance, and only certified fleets may work on its job sites.
General information about insuring larger contractors in San Diego as of November 2026, not legal advice. City of San Diego contract provisions, the SDCCD program, WCIRB classifications, CARB regulations and DIR rules change, and federal maritime coverage depends on the job; read the contract's insurance section and the current rules before you bid. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.