As of November 2026, a large San Diego placement turns on four questions: which of your people sit in a design class and which in the shop class, whether each device went through 510(k) or premarket approval, who owns the equipment in your building, and how long a rebuilt line takes to requalify.
What a San Diego County plant gets asked
- A big floor payrollThe EDD’s preliminary September 2026 estimate counts 110,100 manufacturing jobs in the county, 82,100 of them in durable goods, including 12,700 in aerospace products and parts and 7,000 in ship and boat building.
- Design desks and the shopThe WCIRB’s instrument classes come with companion classes for staff who only design, draft, sell or do clerical work.
- Device quality rulesFDA’s Quality Management System Regulation took effect February 2, 2026, bringing ISO 13485:2016 into 21 CFR Part 820.
- How the device reached marketThe Supreme Court has treated premarket approval and 510(k) clearance very differently when injury claims are filed.
- Government equipmentThe FAR’s government property clause can make your own insurance the reason you are liable for the government’s test sets and tooling.
The building blocks of a plant program are on my manufacturing page. This page covers what the county’s device, defense, maritime and beverage makers add to it, as of November 2026, and leaves general liability aside.
Workers’ comp: design desks, shop floors and the mod
The WCIRB classifies by what the business makes, and its instrument classes split a company’s staff in two. The shop class takes everyone who builds, assembles, repairs, tests or handles the product or its prototypes; a companion class takes only those who never do:
- 3572, electronic medical instruments for diagnosis or treatment, such as imaging and ultrasound systems, monitors, endoscopes, surgical lasers and defibrillators, including shop repair. Installation or repair away from your shop is classed separately as 5128.
- 3682, non-electronic instruments, which names catheters, implantable medical devices, orthodontic components, scalpels and syringes. A company that designs its own instrument and subcontracts the manufacturing stays in this class if it also makes or subcontracts the prototype, or receives the finished product and runs quality control before shipment.
- 8874(6) and 8874(7), the design companions: employees engaged exclusively in hardware or software design, computer-aided design, clerical work or outside sales. Each person’s pay counts only up to an annual cap the WCIRB sets.
- Defense electronics: 3681(1) covers electronic instruments such as telemetry and programmable control systems; 3178 covers electronic elements rated under 746 watts.
A technician who handles prototypes is shop payroll whatever the title, and the audit follows job descriptions and time records. The mod then compares your actual losses with the losses expected for your classes and payroll. Since 2017 the formula gives full weight to a primary portion of each claim, set by employer size, and no weight to the rest, so a run of moderate assembly injuries can move it more than one severe claim. How a mod works.
Device makers: the QMSR, reporting clocks and how you were cleared
The QMSR amends the device good manufacturing practice rule by incorporating ISO 13485:2016, and clause 3 of ISO 9000:2015, by reference; FDA says it now specifically requires risk management. Since February 2, 2026 FDA inspects device makers under compliance program 7382.850 instead of the old inspection technique. Products underwriters ask how your last inspection went.
Three federal clocks start when you learn of a problem:
- Medical device reports: within 30 calendar days of information reasonably suggesting a device you market may have caused or contributed to a death or serious injury, or malfunctioned in a way that would likely do so if it happened again; within 5 work days when an event needs remedial action to prevent an unreasonable risk of substantial harm (21 CFR 803.50 and 803.53).
- Corrections and removals: a written report to FDA within 10 working days of starting one to reduce a risk to health (21 CFR 806.10).
- Registration: every establishment registers each year between October 1 and December 31 and confirms its device listings (21 CFR 807.22). That window is open now, and a missed one leaves the plant in “failed to register” status.
The pathway matters to a claim. The U.S. Supreme Court held in 552 U.S. 312 (2008) that federal preemption bars common-law claims challenging the safety or effectiveness of a device in the form FDA gave premarket approval, while claims that the maker violated FDA’s own requirements can go forward. In 518 U.S. 470 (1996) it held that design claims against a device cleared through 510(k), a review focused on equivalence rather than safety, were not preempted. Underwriters ask which pathway each product took and whether it is implanted. The cost of a removal is insured separately from product liability (life sciences coverage).
Clean rooms, requalification and how long the plant is really down
- The air is the equipment. In a drug or biologics plant, 21 CFR 211.46 requires equipment to control air pressure, micro-organisms, dust, humidity and temperature where appropriate, and filtered air to production areas. Air handlers, chillers, compressed gas systems and freezers belong on the equipment breakdown schedule, with spoilage for work in process.
- Restoration includes revalidation. Rebuilding a line is not the end of the outage: equipment has to be qualified and processes revalidated under your quality system before product ships. Build that time into the business income period and extra expense limit.
- A second plant is not instant. Under 21 CFR 814.39(a)(3), a PMA holder generally must submit a supplement and get FDA approval before using a different facility to make, process or package the device, when the change affects safety or effectiveness.
- Value what you paid for: clean room build-out in a leased building, test fixtures, and molds at contract manufacturers (inland marine). Earthquake is a separate policy (commercial earthquake).
Defense work: whose equipment it is and what the contract demands
FAR 52.245-1, the Government Property clause (September 2021 version), says that unless the contract provides otherwise, the contractor is not liable for loss of government property furnished or acquired under the contract, except in three cases:
- Insurance: the risk is covered by insurance or otherwise reimbursed, to that extent. If your property policy happens to insure the government’s test sets and tooling, you can become liable for them up to that coverage.
- Misconduct: the loss results from willful misconduct or lack of good faith by your managerial personnel.
- Revoked risk: the contracting officer has revoked the government’s assumption of risk after finding your property management inadequate and you did not correct it in time.
After a loss the clause also requires you to protect the property from further loss and separate damaged from undamaged items. Keep it on its own list, and decide with contract counsel whether it belongs on your policy.
DFARS 252.204-7021 requires a current CMMC status at the contract’s level for every system that processes, stores or transmits federal contract information or controlled unclassified information, an annual affirmation of compliance by an affirming official, and the right level flowed down to subcontractors, who affirm before award. A cyber underwriter will ask for your level and the date of the last affirmation. Suppliers whose crews go aboard vessels or onto piers should also check for federal Longshore exposure (how it works).
Breweries and beverage plants at production scale
- Split the taproom out. WCIRB class 2121, Breweries, includes distributing your own beer and running production tours with samples, but taprooms and bars are classed separately as 9084. Distributing other brewers’ beer is 7392, and wine and spirits are 2142(1) and 2142(2).
- FDA still applies. A facility that needs Treasury approval to operate, as a brewery does, and registers with FDA as an alcoholic beverage facility is exempt from the preventive controls subparts of 21 CFR Part 117 for its alcoholic beverages, but the good manufacturing practice rules still apply.
- Watch the non-alcoholic line. The exemption reaches other food only if it is prepackaged and no more than five percent of the facility’s sales. A soda or hop water line that is sold unpackaged, or grows past that share, brings hazard analysis and preventive controls back.
- Tanks and glycol. A chiller or tank failure is a breakdown and spoilage claim. Bond and license rules are on the brewery and winery page.
The tower over what you ship
Hospital systems, distributors, primes and OEM customers set liability limits in their supply agreements, and at this size those limits are met with a lead umbrella and excess layers. For device makers, products liability is often written on its own life sciences policy, so check that the umbrella lists it as underlying insurance; an umbrella that does not schedule it may not sit over it. Put employer’s liability and auto under the same tower, read each layer for medical-products exclusions the primary does not carry, and match the territory to where your products are sold. Umbrella and excess layers.
What to send me
- Payroll by WCIRB class and location, split between design and shop classes, with job descriptions for engineers and technicians.
- Your latest ratesheet and five years of loss runs.
- A device list: FDA class, 510(k) or PMA numbers, implant status, units in use, MDR and recall history, and the outcome of your last FDA inspection.
- Plant values with clean room build-out, key equipment, and how long each line takes to requalify.
- Defense work: your government property list, the property and cyber clauses in your contracts, and your CMMC level.
- Beverage plants: production volume, taproom payroll and any non-alcoholic lines.
- Current declarations pages and the umbrella schedule.
Common questions
What workers’ comp class code is a medical device manufacturer in California?
It depends on the device. Electronic diagnostic or treatment instruments are 3572, and non-electronic instruments, including catheters and implantable devices, are 3682. Staff who only design, draft, do clerical work or sell go in companion class 8874(6) or 8874(7); anyone who builds, tests or handles the product does not.
Can patients sue over a device with FDA premarket approval?
The U.S. Supreme Court held in 552 U.S. 312 (2008) that federal preemption bars common-law claims challenging the safety or effectiveness of a device in its approved form, though claims that the maker violated FDA requirements can proceed. For a device cleared through 510(k), it held in 518 U.S. 470 (1996) that design claims were not preempted.
Am I liable for government-owned equipment in my plant?
Under FAR 52.245-1, unless the contract says otherwise, generally not, except to the extent insurance covers the loss, it stems from managers’ willful misconduct or bad faith, or the government revoked its assumption of risk. Talk to contract counsel before scheduling it on your policy.
When does a device maker have to report a recall to FDA?
Within 10 working days of starting a correction or removal done to reduce a risk to health, under 21 CFR 806.10. Medical device reports have their own clocks: 30 calendar days, or 5 work days when remedial action is needed to prevent an unreasonable risk of substantial harm.
Does a San Diego brewery have to follow FDA’s preventive controls rule?
Not for its beer, if it operates with Treasury approval and is registered with FDA as an alcoholic beverage facility, though good manufacturing practices still apply. A non-alcoholic line brings the preventive controls back unless it is prepackaged and no more than five percent of sales.
General information about insuring manufacturers in San Diego County as of November 2026, not legal or regulatory advice. FDA device and food rules, WCIRB classifications, federal contract clauses and the reach of court decisions change and turn on facts; confirm your obligations with FDA, your contracting officer and counsel. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.
