In the City of Los Angeles, non-residential high-rises permitted before July 1, 1974 had to be fully sprinklered under ordinances that took effect in 1988 and 1989. The city’s mandatory seismic program reaches older concrete but not welded steel frames, the Department of Building and Safety inspects elevators itself instead of the state, and a citywide ordinance now lets many older office buildings become housing. Each of those changes what an underwriter asks and what the policy has to carry.
What a Los Angeles office building gets asked
- Sprinklers in older high-risesNon-residential high-rises permitted before July 1, 1974 fall under the city’s retrofit ordinances.
- Yearly fire system testsLAFD-certified testers file results under Chief’s Regulation 4.
- Frame typeNon-ductile concrete is under a city retrofit ordinance; welded steel moment frames are not.
- City elevator permitsThe city, not the state, inspects elevators.
- Energy reportingThe Energy Commission lists the city’s EBEWE ordinance among the local programs exempt from the state filing.
- ConversionsThe Citywide Adaptive Reuse Ordinance lets buildings 15 years or older in commercial and several other zones convert to housing, most of them by-right.
The coverage parts are laid out on the office building page, including the EBEWE filing duties. Below is the Los Angeles part, as of November 2026.
High-rise sprinklers and LAFD testing
On May 4, 1988, a fire that started on the 12th floor of the 62-story First Interstate Bank Building spread up through part of the 16th floor over about two hours. A National Institute of Standards and Technology review noted that sprinkler piping and heads had just been installed on the fire floor but were not yet in service, and that smoke damage ran heavily from the 12th floor to the top of the tower.
The city’s High-Rise Retrofit Ordinances, Nos. 163836 and 165319, took effect in August 1988 and November 1989. LAFD says they require existing high-rise buildings with a building permit issued before July 1, 1974, other than Group R, Division 1 occupancies, to meet Municipal Code section 91.8604, which calls for automatic sprinklers covering all areas of the building. Ordinance 172284, effective December 17, 1998, allowed extensions of time for buildings that were still not in compliance.
Under Chief’s Regulation 4, certified testers check fire alarms, smoke management, automatic elevators, emergency generators and fire doors every year, among other systems, and file results within 7 days; defects must be corrected within 30 days. A property underwriter asks for:
- Sprinkler status by floor, and the retrofit sign-off for a building permitted before July 1974.
- The latest Regulation 4 reports, with any defects and the date each was cleared.
- Fire pumps, standpipes and water tanks, which the retrofit rules size by building height.
Concrete, steel and the earthquake policy
LADBS describes Ordinance 183893 as requiring the retrofit of two building types: wood-frame soft-story buildings built before 1978, and non-ductile concrete. For concrete, the department points to Northridge, Mexico City and Christchurch, where many concrete buildings of the pre-1976 code era performed poorly and collapsed.
Welded steel moment frames are not on that list. The federal guidance written after Northridge, FEMA-352 (2000), explains why underwriters ask anyway: steel moment-frame buildings from one to 26 stories were found with brittle fractures at beam-to-column connections. They generally did not collapse, but owners paid to investigate and repair connections and lost the use of space, and confirming damage means removing finishes and fireproofing. Santa Monica, a separate city, did write a steel rule: its posted schedule shows notices sent to about 80 steel moment frame buildings on October 23, 2017, with retrofits due by October 2037.
On a tower, earthquake is its own placement, usually a difference-in-conditions policy alongside the property program. The numbers that matter are the total insured value on the schedule, the limit you buy against it, the percentage deductible, and whether loss of rents is included. I ask for the structural drawings or an engineer’s report on the frame, and I check whether the earthquake form pays to open walls and inspect connections after a quake. How commercial earthquake coverage works.
Turning offices into housing
City Planning says the Citywide Adaptive Reuse Ordinance makes buildings at least 15 years old eligible if they sit in a multifamily residential, commercial, parking or public facilities zone, and that most projects will qualify for by-right approval from LADBS. Buildings at least five but less than 15 years old need a Zoning Administrator’s conditional use permit.
For the owner, the insurance question is what covers the existing shell while the inside is gutted. Builder’s risk is written for the new work. IRMI notes that on renovation projects the policy should insure both the existing structure and the new construction, and that many builder’s risk policies pay only actual cash value on the existing structure. The existing frame and skin of a tower are worth a great deal, so I want the shell on replacement cost, on either the builder’s risk or the property policy, with the construction contract saying which. Once units are leased, the building is insured as housing, at its new replacement cost.
Empty floors and vacant towers
A property policy’s vacancy condition is measured against how much of the building is in use, so a tenant moving off several floors can change your coverage before you notice (how vacancy affects a commercial policy). A fully vacated high-rise also has fire department rules. LAFD’s posted requirements for vacated, non-occupied high-rise buildings, last revised in 2003, include:
- No one occupies any part of the building without approval from the Fire Department and LADBS.
- Windows, doors and other openings are secured, and an access key is kept in an approved key box.
- Elevator service is discontinued, and electric power is shut off except for fire pumps and supervised sprinklers.
- Sprinklers stay supervised, and fire pumps, standpipes and sprinklers are maintained and tested under Regulation 4.
- A building vacant over six months loses its certificate of occupancy, and reoccupying it takes a new one.
A vacant tower usually moves to a vacant building policy until tenants return, so tell me the dates early.
Elevators, boilers and the central plant
The City Controller’s 2018 audit called Los Angeles unique: no other local jurisdiction in California runs its own elevator and conveyance inspection program, and the city’s building code requires a valid permit for each conveyance, which takes an annual LADBS inspection. Boilers and air tanks in the city also get their permits to operate from LADBS rather than the state’s Pressure Vessel Unit. Those permits and inspection reports are the paper trail an equipment breakdown underwriter wants to see.
Equipment breakdown is the coverage for the plant itself. Chillers, cooling towers, boilers, switchgear and elevator machinery are costly to repair and slow to replace. I schedule the plant equipment, ask for the current elevator and boiler permits and the service contracts, and match the breakdown policy’s rent and extra expense coverage to the income at stake.
Tenant improvements and loss of rents
Office leases put a lot of value into the space itself. IRMI explains that tenants’ improvements and betterments become part of the real property and in most cases belong to the building owner, while the tenant holds a use interest until the lease ends. It also warns owners that the coinsurance condition does not care which party the lease says will insure them: if the building limit leaves them out, the owner can face a coinsurance penalty. When the lease puts them on the tenant and you do not want to cover them, the policy should be endorsed to remove them.
Loss of rents should be sized to base rent plus the operating expenses tenants reimburse, for the full time a high-rise repair and re-leasing would take, which can run past a policy’s standard period; an extended period of indemnity covers that gap. I read each major lease’s casualty and rent abatement clauses before setting the limit.
Terrorism and the umbrella tower
Treasury runs the federal terrorism backstop, the Terrorism Risk Insurance Program, and its program page gives December 31, 2027 as the end date set by the 2019 reauthorization. At the end of June 2026 the House passed H.R. 7128 to extend it through 2034; before you renew into 2028, check whether an extension has become law. Insurers have to offer the coverage, but no owner is required to buy it, so on a downtown or Century City tower the decision usually comes down to what the loan documents and the largest leases require. How TRIA coverage works.
General liability for the lobby, garage and common areas is the base of the casualty side, and a commercial umbrella with excess layers above it should reach the highest limit your lender or any lease requires.
What to send me
- Address, year built, original permit date, stories and height, with gross square footage and frame type.
- Sprinkler and high-rise retrofit paperwork, and the last Regulation 4 test reports.
- Any LADBS order, engineer’s report or seismic study on the frame.
- A statement of values for the building, the tenant improvements you insure, and rents.
- The rent roll, with lease expirations, vacant floors and each lease’s insurance clause.
- Elevator and boiler permits and the central plant equipment list.
- Loan insurance requirements, including earthquake, terrorism and umbrella limits.
- The declarations pages now in force, and five years of loss runs.
Common questions
Who insures high-rise office buildings in Los Angeles?
Both admitted and surplus lines insurers write Los Angeles towers, and a large building’s limit is often split among several of them. Sprinkler status, Regulation 4 results, frame type and a current statement of values decide how much interest a submission gets.
Does Los Angeles require sprinklers in older office high-rises?
Yes. The city’s High-Rise Retrofit Ordinances, in effect since 1988 and 1989, require existing high-rise buildings permitted before July 1, 1974, other than Group R, Division 1 occupancies, to meet Municipal Code section 91.8604, which calls for sprinklers throughout.
Does the Los Angeles seismic retrofit ordinance cover steel-frame office towers?
No. LADBS describes Ordinance 183893 as covering wood-frame soft-story and non-ductile concrete buildings. Earthquake underwriters still ask about pre-Northridge welded steel connections, and Santa Monica runs its own steel moment frame program.
Do I need terrorism insurance on a Los Angeles office tower?
No law makes an owner buy it, but insurers have to offer it, and loan documents and large leases often require it. The federal program’s current end date is December 31, 2027.
Who insures tenant improvements in a Los Angeles office lease?
The lease decides who pays, but the improvements usually become part of the building. If your building limit leaves them out, the coinsurance condition can still penalize you, so either include them or endorse them off when the lease puts them on the tenant.
Who inspects elevators in a Los Angeles office building?
LADBS does. The City Controller describes Los Angeles as the only local jurisdiction in California with its own elevator inspection program, and each conveyance needs a permit that takes an annual city inspection.
What happens to my insurance if I convert an office building to apartments in Los Angeles?
During the work, builder’s risk covers the construction and the existing shell needs coverage too, ideally at replacement cost. Afterward, the building is insured as housing.
General information about insuring office buildings in the City of Los Angeles as of November 2026, not legal or engineering advice. High-rise retrofit rules, LAFD testing requirements, seismic ordinances, the Adaptive Reuse Ordinance and the federal terrorism program change; confirm your building’s status with LADBS and LAFD, and read your loan and lease insurance requirements. Coverage depends on the policy issued. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.