Art Deco apartment building behind palm trees
Warehouse Insurance · Los Angeles County

Warehouse insurance in Los Angeles County

A warehouse in Vernon, Commerce, Carson, Torrance or the San Fernando Valley may be a decades-old tilt-up, and the questions follow: were the walls designed before the codes changed, is a city retrofit order open, do the racks, chargers and battery stock meet the fire code, and how is payroll built where cities set their own minimum wage. Answer those with documents and the property, comp, auto and umbrella go to market as one program.

By Sam Alishahi · CA Insurance License #4348151 · Reviewed November 2026 · How this page is researched

LA County warehouses at a glance

Here a warehouse’s age and city matter as much as its size. Los Angeles and Torrance have mandatory programs reaching older concrete-wall buildings, the fire code has rules for chargers and battery stock, and AB 98 requires a revised truck routing plan before a new tenant’s business license. Send the retrofit status, rack plans and payroll by location.

What is different about a Los Angeles County warehouse

  • City tilt-up rulesThe City of Los Angeles applies Division 91 of its building code to buildings designed under codes in effect before January 1, 1976 that have tilt-up concrete walls, and it readopted the division effective December 31, 2025.
  • Torrance’s programTorrance’s City Council approved seismic retrofit ordinance 3916 on March 14, 2023; it reaches wall anchorage in rigid-wall, flexible-diaphragm buildings, and notification letters have not yet gone out.
  • Truck routesUnder AB 98, cities and counties here that have warehouses must adopt a truck route ordinance by January 1, 2028, or 2030 for a city of 50,000 people or fewer.
  • Air districtSouth Coast AQMD, covering large areas of the county, runs WAIRE for warehouses of 100,000 square feet or more.
  • PayrollThe City of Los Angeles minimum wage became eighteen dollars and forty-two cents an hour on July 1, 2026, and it resets every July 1 by the Los Angeles-area consumer price index.

The coverage parts are on my warehouse insurance page; this page covers what Los Angeles County adds, as of November 2026.

Tilt-up walls and the retrofit question

A tilt-up wall is a precast concrete panel, cast flat and lifted into place. Division 91 says pre-1976 tilt-ups have been categorized, based on past earthquakes, as potentially hazardous and prone to significant damage, including possible collapse.

  • City of Los Angeles: once Building and Safety serves an order, the owner has 275 days to submit an analysis showing compliance, strengthening plans or demolition plans, then must finish within the division’s time limits. Vacating does not count, and a strengthened building must be maintained to that standard.
  • Concrete floors or roofs: the city’s separate non-ductile concrete program under Ordinance 183893 defines a concrete building as one with concrete floors or roofs on concrete walls, columns or frames; ask your engineer which program, if either, applies.
  • Torrance: the city describes these as concrete or masonry walls under a wood panelized roof with a generally weak roof-to-wall connection, and treats those built before the 1994 Uniform Building Code as at risk.
  • Elsewhere: I check the city’s own program before I quote earthquake.

Without the engineer’s analysis and permit sign-off I have nothing to show an earthquake underwriter, so gather them before renewal. Work under way may need builder’s risk, code upgrades after a loss need ordinance or law coverage, and earthquake is a separate commercial earthquake or DIC policy.

Racks, forklift chargers and the fire code

The 2025 California Fire Code, in effect since January 1, 2026, sets rules an underwriter checks on a walk-through:

  • Forklift charging: approved chargers, combustible storage at least 3 feet away, no charging in areas open to the public, ventilation against flammable gas, and a 4-A:20-B:C extinguisher within 20 feet.
  • Flue spaces: sprinklered racks must keep the required flue spaces open, so pallets pushed into the flue are a code problem as well as a sprinkler problem.
  • Columns: steel building columns in rack storage are protected as NFPA 13 requires.
  • Fire department access doors: where required, no more than 125 feet apart (200 in an existing building with no change of occupancy), reachable without a ladder, marked, with a key box; a roll-up door counts only if approved.
  • Battery stock: more than 15 cubic feet of lithium-ion or lithium metal batteries needs a permit, and an indoor storage area needs an approved engineering report.

After the January 2025 fires, the Los Angeles County Fire Department warned that damaged lithium-ion batteries can reignite, explode or release toxic gases even after a fire is out. With battery stock, that can slow cleanup, so I read the debris removal and pollutant cleanup limits along with the building limit.

AB 98: the truck routing plan and your next tenant

AB 98 (2024), amended by SB 415 (2025), applies statewide. The parts an owner here meets first:

  • A truck routing plan: before a certificate of occupancy, the operator gives the planning director a plan with hours, the types of items stored, and routes to the state highway system that avoid homes and schools where possible, plus measures against trucks queuing or parking on public streets.
  • A revised plan for each new tenant, filed before the city or county issues that tenant a business license.
  • Design rules near homes and schools: since January 1, 2026, a new or expanded warehouse of 250,000 square feet or more on industrial land, with a loading bay within 900 feet of a sensitive receptor, must include the Tier 1 design elements and keep loading bays at least 300 feet from that receptor’s property line.
  • Signs: three-minute anti-idling signs at entrances and loading bays, and exit signs pointing to the truck route.

The routing plan states what is stored, the same question underwriters ask, so keep the plan and your commodity list consistent.

WAIRE filings for owners and operators

Rule 2305 splits the paperwork. The owner files a Warehouse Operations Notification within 14 days after a new operator can use at least 50,000 square feet of a building of 100,000 square feet or more, and within 30 days after a renovation changing the warehouse space gets its certificate of occupancy. The operator files an Initial Site Information Report by July 1 of the year its first annual report is due, then a yearly report; one that moves out early files by the day it vacates. The site report asks about chargers, and the menu awards points for zero-emission yard trucks, charger projects and solar.

Each is property to insure: chargers and solar on the building schedule, yard trucks on the equipment or auto schedule, equipment breakdown for the electrical gear. The lease should say who carries WAIRE and who insures that equipment.

Workers’ comp and the payroll behind it

  • How it is secured: Labor Code 3700 allows an authorized insurer or a certificate of consent to self-insure from the Director of Industrial Relations, on proof of ability to pay. Larger operations can compare a fixed-cost policy with loss-sensitive programs.
  • Local wages: premium is rated on payroll, so the city’s yearly wage reset can raise the base for hours worked inside city limits. Its ordinance counts as an employer anyone controlling wages, hours or conditions, including through a staffing agency, and requires four years of payroll records.
  • Workplace violence plan: Labor Code 6401.9, enforceable since July 1, 2024, requires covered employers to keep a written plan and a violent incident log, held five years.
  • Quota retaliation: the AB 701 quota law presumes retaliation for adverse action within 90 days after an employee’s first yearly request for quota data or a quota complaint, and lets cities and counties protect workers more. Those claims belong to employment practices liability, so I quote it with the comp.

Classification and audits: my Los Angeles workers’ comp page.

Customers’ goods, commingled lots and the umbrella

The duty of care and receipt limits are on the warehouse page. Two more Commercial Code sections shape a 3PL’s legal liability:

  • Keep lots separate: unless the receipt says otherwise, Section 7207 requires each receipt’s goods to be kept identifiable. Commingled fungible goods are owned in common, and the warehouse is liable to each owner for its share.
  • Say what you did not count: under Section 7203, someone relying on a receipt’s description can recover for goods never received or misdescribed, unless the receipt conspicuously says the warehouse does not know, with words such as “said to contain,” and that is true.

Sealed containers you never open are where that wording earns its place; hauling them from the ports is its own placement (port drayage). If you own the inventory, insure it on your property or a stock throughput policy, not a 3PL’s limit. General liability is one line. The umbrella takes more care: the lease and your largest contracts set its limit and endorsements, and each layer must sit over the auto, liability and employer’s liability.

What to send me

  • Each building’s city, year built, wall and roof type, and size.
  • Retrofit paperwork: any city order, the engineer’s analysis, strengthening plans and the finaled permit.
  • The fire file: storage plans and permits, sprinkler design, charger locations, any battery permit.
  • AB 98 and WAIRE: the truck routing plan and your Rule 2305 notifications and reports.
  • Payroll by location and class, with staffing-agency workers shown, your current mod, and five years of loss runs on every line.
  • Contracts: the lease’s insurance clause, your receipt form and your largest customer agreements.
  • A statement of values for buildings, racking, chargers, solar, stock and business income.

Common questions

Who insures older tilt-up warehouses in Los Angeles?

Admitted insurers and surplus lines markets both write them. The answer turns on whether the building was designed before 1976, whether a city order is open, and what the engineer’s analysis shows.

Does the City of Los Angeles require tilt-up warehouses to be retrofitted?

Division 91 applies to buildings with tilt-up concrete walls designed under codes in effect before January 1, 1976. Once the city serves an order, the owner has 275 days to submit an analysis, strengthening plans or demolition plans.

Does Torrance require seismic work on warehouses?

Its 2023 ordinance covers wall anchorage in rigid-wall, flexible-diaphragm buildings, and the city treats those built before the 1994 Uniform Building Code as at risk. As of November 2026 the city says notification letters have not yet been sent.

What does AB 98 mean when I lease my warehouse to a new tenant?

A revised truck routing plan goes to the planning director before the city or county issues the new tenant a business license. The plan describes hours of operation, the types of items stored and the truck routes.

Do forklift battery chargers affect my warehouse insurance?

Yes. Underwriters ask where chargers are and what is stored around them, the fire code keeps combustibles at least 3 feet away, and the chargers belong on the property schedule.

Is my Los Angeles County warehouse subject to WAIRE?

It is if the building is within the South Coast AQMD and has 100,000 square feet or more of indoor floor space. The owner files the notifications, and an operator using at least 50,000 square feet earns WAIRE Points and files the annual report.

General information about insuring warehouses and distribution centers in Los Angeles County as of November 2026, not legal or engineering advice. Retrofit ordinances, fire code amendments, AB 98, South Coast AQMD Rule 2305, wage ordinances and Cal/OSHA rules change; confirm current requirements with your city’s building and fire departments, the air district and counsel. Coverage depends on underwriting and the terms, conditions and exclusions of the policy actually issued.

Los Angeles County warehouses

Send the retrofit status and the rack plans.

With each building’s year and wall type, any city order, the fire permits, payroll by location and five years of losses, I can quote the property, workers’ comp, auto and umbrella together.

Alishahi Insurance · Saman Alishahi, independent insurance broker, California License #4348151, 439 N Canon Dr, Penthouse, Beverly Hills, CA 90210. Serving Los Angeles County from the Beverly Hills office; no office in Los Angeles County. General information, not a quote or a promise of coverage. Some policies may be placed with nonadmitted (surplus lines) insurers, which are not members of the California Insurance Guarantee Association (CIGA).

Get a quote

Tell me how to reach you. I’ll take it from there.

Takes about 30 seconds. Your next step comes by email, and you get an update at every step until your quotes are ready.

(877) 711-4545

Answered 24/7 · CA License #4348151

Only your name, phone and email are required; every question here is optional. This is a request for insurance: Alishahi Insurance (Saman Alishahi, licensed insurance agent) will contact you about it by email, and by text if you check the box. Sending this form doesn’t bind coverage; coverage starts only when it’s confirmed in writing.

Not shopping yet?

Get a reminder before your renewal.

Tell me when your policy renews and I’ll email you about six weeks before, when it’s worth comparing. One email, no calls.